by Asher | Aug 26, 2026 | Water Treatment
Water damage cases can turn messy fast. A pipe bursts, a sewer backs up, or a storm floods a basement, and the cause is rarely clear to the naked eye. Without a water damage litigation expert, lawyers and insurers end up arguing over guesses instead of facts. A...
by Asher | Aug 25, 2026 | Water Piping Systems
When a water pipeline fails, figuring out why takes more than a quick look at a wet spot on the ground. A water pipeline leak expert witness studies the pipe material, the pressure history, and the site conditions to explain what really happened. This work can help...
by Asher | May 7, 2020 | Stormwater
Project Manager, Pump Stations Improvement Project. Was the lead designer on this project involving the replacement of pumping equipment and installation of a new radio alarm system in four pump stations. Design of the radio telemetry system was complicated by the...
by Asher | May 7, 2020 | Stormwater
Design of the California-Grove Stormwater Pump Station. The facilities included: a 28 CFS (18 MGD) pump station using submersible pumps; a standby generator; a storage building; drain inlets and piping; and site improvements. The construction cost of the facilities...
by Asher | May 7, 2020 | Stormwater
Prepared a preliminary design of a stormwater pumping system to minimize the time during which water would stand in a stormwater detention basin. The detention basin was used as a parking area for the nearby fair grounds.