by Asher | May 7, 2020 | Stormwater
Conducted a feasibility study of installing a mechanically cleaned bar screen on a stormwater pump station. Received the assignment on Friday. Delivered the report to the City engineering staff on Monday afternoon for use in a meeting with the City Manager on Tuesday...
by Asher | May 7, 2020 | Stormwater
Project manager on the feasibility study and design of a storm water pump station modification project. The feasibility study analyzed the alternatives of two separate pump stations versus a single pump station connected by 1,300 feet of 60 inch sewer. The single pump...
by Asher | May 7, 2020 | Stormwater
Reviewed the stormwater permit, draft master plan, standard specifications, Guidance Manual, and dual use document to evaluate why there is so much diversity in the types of stormwater detention basins that are built. Made recommendations on how the designs of the...
by Asher | May 7, 2020 | Stormwater
Assisted the City staff in designing the completion of a stormwater pump station to empty the dual-use detention basin that had been constructed as a feature of the park. Calculated the required pumping rates to meet various requirements and confirmed the pump...
by Asher | May 7, 2020 | Water Treatment
Provided technical advice and design input to the City staff on the construction of a new irrigation well to serve the golf course at the Concord Naval Weapons Station. Provided design details, helped draft specifications, provided technical review during...