by Asher | Apr 27, 2020 | Forensic Engineering
Bonneau Dickson has served as an expert witness on several cases in which it was alleged that public sewer systems had allowed perchloroethylene (PCE) that was discharged by dry cleaning establishments to contaminate the groundwater. Topics of interest were design...
by Asher | Apr 27, 2020 | Forensic Engineering, Standard of Care
Reviewed the Standard Of Care in the design of a wastewater system for a food processor in the Sacramento River valley. Discovered that the design engineer had not included a solids removal unit process in the aerated lagoon wastewater treatment system, thus the...
by Asher | Apr 27, 2020 | Uncategorized
Los Angeles Area. Sewage Backup Through a Backflow Prevention Valve (Backwater Valve). Technical expert in a case where flow from a trunk sewer flooded and severely damaged a million dollar home in Southern California. The sewage leak was caused not by a blockage of...
by Asher | Apr 27, 2020 | Design, Other Design
Marin County. Designed an on-site mound septic system for an existing residence. Contra Costa County. Designed an on-site at-grade wastewater treatment and disposal system on a very tight site for a large new private residence.
by Asher | Apr 27, 2020 | Design, Stormwater Facilities
City of Burlingame. Design of the California-Grove Stormwater Pump Station. The facilities included: a 28 CFS (18 MGD) pump station using submersible pumps; a standby generator; a storage building; drain inlets and piping; and site improvements. The construction cost...