by devadmin | May 7, 2020 | Stormwater
Project Manager, Pump Stations Improvement Project. Was the lead designer on this project involving the replacement of pumping equipment and installation of a new radio alarm system in four pump stations. Design of the radio telemetry system was complicated by the...
by devadmin | May 7, 2020 | Stormwater
Design of the California-Grove Stormwater Pump Station. The facilities included: a 28 CFS (18 MGD) pump station using submersible pumps; a standby generator; a storage building; drain inlets and piping; and site improvements. The construction cost of the facilities...
by devadmin | May 7, 2020 | Stormwater
Prepared a preliminary design of a stormwater pumping system to minimize the time during which water would stand in a stormwater detention basin. The detention basin was used as a parking area for the nearby fair grounds.
by devadmin | May 7, 2020 | Stormwater
Conducted a feasibility study of installing a mechanically cleaned bar screen on a stormwater pump station. Received the assignment on Friday. Delivered the report to the City engineering staff on Monday afternoon for use in a meeting with the City Manager on Tuesday...
by devadmin | May 7, 2020 | Stormwater
Project manager on the feasibility study and design of a storm water pump station modification project. The feasibility study analyzed the alternatives of two separate pump stations versus a single pump station connected by 1,300 feet of 60 inch sewer. The single pump...