Design of the California-Grove Stormwater Pump Station. The facilities included: a 28 CFS (18 MGD) pump station using submersible pumps; a standby generator; a storage building; drain inlets and piping; and site improvements. The construction cost of the facilities was $1.3 million.
– March, 2001. Bibb and Assoc. Chuck Helseth. Doug Bell, Syed Murtuza, Ralph Bagdon, and Phil Scott for the City of Burlingame.