by Asher | May 6, 2020 | Septic Systems
Designed a system to replace a failed leach field. It is likely that the problem was a crushed pipe leading to the leach field rather than the leach field itself, but because the owners of the property had been red-tagged by the County for doing construction without a...
by Asher | May 6, 2020 | Septic Systems
Prepared an evaluation of the sewerage system of an upscale subdivision containing 47 lots. Each house has a septic tank. The effluent from the septic tanks is treated in a recirculating gravel filter and then disposed of in a series of leach fields. The original...
by Asher | May 6, 2020 | Septic Systems
Lead engineer on design of a $5 million, EPA Clean Water Grant funded project for three small communities in Mariposa County, CA. Each house had an individual septic tank but disposal was in the community mound systems. At the time, it was the largest mound system...
by Asher | May 6, 2020 | Waste Water Pump Stations, Water Pump Stations
Estimated the costs of a five-year capital improvement program for the City’s 16 sewage and stormwater pump stations for use as input in the budgeting process.
by Asher | May 6, 2020 | Waste Water Treatment, Water Treatment
Designed or analyzed several septage receiving stations in California. The septage receiving stations generally consisted of concrete slabs sloping down to a screen and an intake into a liquid transport pipe. For the Kalamazoo resume.