Lead design engineer on a project in which a 500,000 gallon water storage tank was constructed on a ridge at the highest part of the City of Brisbane. An intermediary water pump station was evaluated and determined to have adequate capacity to serve with the new tank. Construction documents were delivered just 43 days after the design work was started.