Bonneau Dickson Logo
  • Home
  • Forensic Engineering
    • Sewage Overflows
    • Septic Systems
    • Sewage & Wastewater Systems
    • Water Systems
    • Stormwater & Flooding
    • Pump Stations
    • Contamination of Potable Water
    • PCE Contamination
    • Mobile Home Parks
    • Plumbing Experience
  • Wastewater
    • Sewers
    • Wastewater Treatment
    • Wastewater Pump Stations
  • Water
    • Water Piping Systems
    • Water Pump Stations
    • Water Treatment
  • About
    • Blog
  • Contact
  • Resumes
  • Employment History
Call Now
  • Home
  • Forensic Engineering
    • Sewage Overflows
    • Septic Systems
    • Sewage & Wastewater Systems
    • Water Systems
    • Stormwater & Flooding
    • Pump Stations
    • Contamination of Potable Water
    • PCE Contamination
    • Mobile Home Parks
    • Plumbing Experience
  • Wastewater
    • Sewers
    • Wastewater Treatment
    • Wastewater Pump Stations
  • Water
    • Water Piping Systems
    • Water Pump Stations
    • Water Treatment
  • About
    • Blog
  • Contact
  • Resumes
  • Employment History
(510) 845-8625

Los Angeles Area. Sewage Backup Through a Backflow Prevention Valve (Backwater Valve).

by Asher | May 6, 2020 | Sewage Overflows

Technical expert in a case where flow from a trunk sewer flooded and severely damaged a million dollar home in Southern California. The sewage leak was caused not by a blockage of the trunk sewer, but by the inadequate hydraulic capacity of the sewer. The major issues...

Failure to Disclose, Leach Field Failure, San Diego, CA.

by Asher | May 6, 2020 | Septic Systems

Provided technical advice to an attorney representing sellers of a home who were sued for failing to disclose problems with the leach field. The Sellers had a problem with the leach field a year Surfacing Septic Tank Effluent. Reviewed voluminous documents and...

Evaluation Of An Onsite Wastewater Treatment And Disposal System For A Restaurant, Marin County, CA.

by Asher | May 6, 2020 | Septic Systems

Evaluated a failing onsite wastewater treatment and disposal system. Determined that the design capacity of the system was less than required for the existing flows from the restaurant. – Gilbert v. Scott. Stinson Beach.

Death By Septicity From Gardening In A Leach Field, Southern California.

by Asher | May 6, 2020 | Septic Systems

Represented the defense of a septic system installer. A handicapped person who was unable to walk had gardened in the area above the leach field that defendant had constructed, had come down with septicity, and had died. It was alleged that the septicity was due to...

Evaluation Of A Leachfield For An Expanded Church, Palm Beach County, Florida.

by Asher | May 6, 2020 | Septic Systems

Evaluated a proposed leach-field expansion to serve a greatly expanded church. Determined that the leach-field required by County regulations could not be fit on the available site. -2005, July. Agape Church. Pam Crawford.
Page 28 of 31« First«...1020...2627282930...»Last »

Areas of Interest

  • Sewage Overflows
  • Wastewater Facilities Design
  • Wastewater Facilities Planning
  • Septic Systems
  • Water Facilities Design
  • Water Facilities Planning
  • Standard of Care
  • Stormwater Facilities Design
  • Stormwater Facilities Planning
  • PCE (Perchlorethylene-Laundry Solvent) Contamination

Bonneau Dickson, PE

Free Consultation

Call: 510) 845-8625
Fax: (510) 845-4606

dickson.bonneau@gmail.com

Bonneau Dickson
2428 McGee Avenue Suite 2
Berkeley, CA 94703

Quick Links

  • Home
  • Resumes
  • Sewers
  • Water Systems
  • Septic Systems
  • Stormwater
  • Employment History
  • Blog
  • Contact
  • HTML Sitemap

Get In Touch!



Located

2428 McGee Avenue, Suite 2
Berkeley, CA 94703



Call

(510) 845-8625



Email

dickson.bonneau@gmail.com

  • Follow
  • Follow
  • Follow

Bonneau Dickson | Expert Witness | Consulting Sanitary Engineer © 2026 | Designed by Advantage Media Partners