by Asher | May 6, 2020 | Septic Systems
Provided technical advice to an attorney representing sellers of a home who were sued for failing to disclose problems with the leach field. The Sellers had a problem with the leach field a year Surfacing Septic Tank Effluent. Reviewed voluminous documents and...
by Asher | May 6, 2020 | Septic Systems
Evaluated a failing onsite wastewater treatment and disposal system. Determined that the design capacity of the system was less than required for the existing flows from the restaurant. – Gilbert v. Scott. Stinson Beach.
by Asher | May 6, 2020 | Septic Systems
Represented the defense of a septic system installer. A handicapped person who was unable to walk had gardened in the area above the leach field that defendant had constructed, had come down with septicity, and had died. It was alleged that the septicity was due to...
by Asher | May 6, 2020 | Septic Systems
Evaluated a proposed leach-field expansion to serve a greatly expanded church. Determined that the leach-field required by County regulations could not be fit on the available site. -2005, July. Agape Church. Pam Crawford.
by Asher | Apr 27, 2020 | Other Planning, Planning
Pittsburg Montezuma Stormwater Pump Station. Made a preliminary analysis of pump replacement at an ancient stormwater pump station. Noted to the client that the various criteria for the project were conflicting. Recommended that the project not be undertaken until...