by Asher | May 6, 2020 | Pump Stations
Provided expert engineering advice to a New England City where six large wastewater pumps began to fail after only four months of service. Documented why the City was justified in deciding to replace the pumps rather than to continue to nurse them along.
by Asher | May 6, 2020 | Pump Stations
Represented the owner of a mobile home in a park where the sewer system regularly overflowed under his unit. Determined that the previous overflows were due to problems with the pump station that served the mobile home park. These problems were fixed but another...
by Asher | May 6, 2020 | Flooding, Storm Water
Conducted a feasibility study of installing a mechanically cleaned bar screen on a stormwater pump station. Received the assignment on Friday. Delivered the report to the City engineering staff on Monday afternoon for use in a meeting with the City Manager on Tuesday...
by Asher | May 6, 2020 | Flooding, Storm Water
Assisted the City staff in designing the completion of a stormwater pump station to empty the dual-use detention basin that had been constructed as a feature of the park. Calculated the required pumping rates to meet various requirements and confirmed the pump...
by Asher | May 6, 2020 | Flooding, Storm Water
Design of the California-Grove Stormwater Pump Station. The facilities included: a 28 CFS (18 MGD) pump station using submersible pumps; a standby generator; a storage building; drain inlets and piping; and site improvements. The construction cost of the facilities...