Prepared a preliminary design of a stormwater pumping system to minimize the time during which water would stand in a stormwater detention basin. The detention basin was used as a parking area for the nearby fair grounds.
Prepared a preliminary design of a stormwater pumping system to minimize the time during which water would stand in a stormwater detention basin. The detention basin was used as a parking area for the nearby fair grounds.