by Asher | May 7, 2020 | Stormwater
Project manager on the feasibility study and design of a storm water pump station modification project. The feasibility study analyzed the alternatives of two separate pump stations versus a single pump station connected by 1,300 feet of 60 inch sewer. The single pump...
by Asher | May 7, 2020 | Stormwater
Reviewed the stormwater permit, draft master plan, standard specifications, Guidance Manual, and dual use document to evaluate why there is so much diversity in the types of stormwater detention basins that are built. Made recommendations on how the designs of the...
by Asher | May 7, 2020 | Stormwater
Assisted the City staff in designing the completion of a stormwater pump station to empty the dual-use detention basin that had been constructed as a feature of the park. Calculated the required pumping rates to meet various requirements and confirmed the pump...