by devadmin | May 6, 2020 | Sewers, Waste Water
Design of 1,300 feet of sewer, including two jack and bores. During the study phase, inversion lining and slip lining were considered for parts of the sewer project. The project also included replacement of pumping equipment and installation of a new radio alarm...
by devadmin | May 6, 2020 | Sewers, Waste Water
Elmira Road Trunk Sewer Replacement. Design of 3,500 feet of 54- inch sewer to replace an existing sewer which was damaged by hydrogen sulfide corrosion. To protect the new sewer, PVC lined concrete pipe was specified.