by devadmin | May 6, 2020 | Sewers, Waste Water
Design of small diameter variable grade effluent sewers and mound disposal systems for three rural communities. The work included a review of available technical literature on these innovative technology systems and discussions with experts throughout the United...
by devadmin | May 6, 2020 | Sewers, Waste Water
Participated in an analysis of relocating a major transmission main from a beach to an inland location. The original main had been damaged by movement of the beach sand during major storms. The alternative location required pumps with greater heads but it was found...
by devadmin | May 6, 2020 | Sewers, Waste Water
Analyzed three alternatives for disposing of wastewater from a remote canyon park: (a) over a mile of conventional sanitary sewer to connect to the City sewer system; (b) septic tanks with a small diameter variable grade effluent sewer (VGES) to the City sewer system;...
by devadmin | May 6, 2020 | Sewers, Waste Water
Served as the lead project engineer on the design of rehabilitation of 25,000 linear feet of sewer pipe for the Santa Cruz County Sanitation District to correct excessive leakage (infiltration and inflow). The project rehabilitated the building laterals from the...
by devadmin | May 6, 2020 | Sewers, Waste Water
Sewer master plan for a 66 square mile region. The district had been in one geographic basin for 25 years, but had recently been given responsibility for a much expanded area and two new trunk sewer systems. The work of projecting growth rates an land use patterns was...
by devadmin | May 6, 2020 | Sewers, Waste Water, Waste Water Pump Stations, Water Pump Stations
Design and construction services on 24,000 feet of sanitary sewers and forcemains, and two new sewage pumping stations for the Bell Road Subdivision.