by devadmin | May 6, 2020 | Flooding, Storm Water
Conducted a feasibility study of installing a mechanically cleaned bar screen on a stormwater pump station. Received the assignment on Friday. Delivered the report to the City engineering staff on Monday afternoon for use in a meeting with the City Manager on Tuesday...
by devadmin | May 6, 2020 | Flooding, Storm Water
Assisted the City staff in designing the completion of a stormwater pump station to empty the dual-use detention basin that had been constructed as a feature of the park. Calculated the required pumping rates to meet various requirements and confirmed the pump...
by devadmin | May 6, 2020 | Flooding, Storm Water
Design of the California-Grove Stormwater Pump Station. The facilities included: a 28 CFS (18 MGD) pump station using submersible pumps; a standby generator; a storage building; drain inlets and piping; and site improvements. The construction cost of the facilities...
by devadmin | May 6, 2020 | Flooding, Storm Water
Provided technical advice on stormwater improvements to accommodate further development of the site. The airport authority questioned how additional stormwater piping without any additional pumping capacity could increase the capacity of the overall stormwater system....
by devadmin | May 6, 2020 | Flooding, Storm Water
Prepared a Water Quality Plan for the City of San Juan Capistrano to control non-point sources of pollution. This plan is a part of stormwater work mandated by the Clean Water Act.
by devadmin | May 6, 2020 | Flooding, Storm Water
Reviewed the stormwater permit, draft master plan, standard specifications, Guidance Manual, and dual use document to evaluate why there is so much diversity in the types of stormwater detention basins that are built. Made recommendations on how the designs of the...