by devadmin | May 6, 2020 | Waste Water Treatment, Water Treatment
Conducting a “repair, replace, or abandon” evaluation on the rotating biological contactor (RBC) process at this small treatment plant in the Sierras. When the shaft of the existing RBC unit broke for the second time, the Association requested an...
by devadmin | May 6, 2020 | Waste Water Treatment, Water Treatment
Preliminary engineering report on a belt filter press facility to be constructed in an existing vacuum filter building. Because of the relatively large press capacity and difficulty of accessing the trucks that will haul the pressed cake away, consideration was given...
by devadmin | May 6, 2020 | Waste Water Treatment, Water Treatment
Prepared a preliminary design of a dissolved air flotation facility to remove algae from storage pond water. The facility will allow the plant to discharge to the river in several months during which the algae create an unallowable total suspended solids...
by devadmin | May 6, 2020 | Septic Systems
Reviewed voluminous documents and summarized the technical facts for the attorneys for two insurance companies, whose insureds were being sued by a downslope neighbor who claimed that their septic systems were discharging on to his property. Interviewed the...
by devadmin | May 6, 2020 | Waste Water Treatment, Water Treatment
Prepared a preliminary engineering report for the expansion of this wastewater treatment plant. The hydraulics of the plant were investigated and various piping improvements were identified to increase the hydraulic capacity of the plant. A third train of rotating...