by devadmin | May 7, 2020 | Stormwater
Reviewed the stormwater permit, draft master plan, standard specifications, Guidance Manual, and dual use document to evaluate why there is so much diversity in the types of stormwater detention basins that are built. Made recommendations on how the designs of the...
by devadmin | May 7, 2020 | Stormwater
Assisted the City staff in designing the completion of a stormwater pump station to empty the dual-use detention basin that had been constructed as a feature of the park. Calculated the required pumping rates to meet various requirements and confirmed the pump...
by devadmin | May 7, 2020 | Water Treatment
Provided technical advice and design input to the City staff on the construction of a new irrigation well to serve the golf course at the Concord Naval Weapons Station. Provided design details, helped draft specifications, provided technical review during...
by devadmin | May 7, 2020 | Water Treatment
Was part of the design team that designed this completely new 80 MGD water treatment plant. The plant included six 16.7 MGD gravity sand filters.
by devadmin | May 7, 2020 | Water Treatment
Conducted an evaluation of a well drilling program in Belize for USAID. Determined that the program was far behind schedule but that USAID was only paying for work that was done and that progress was being made, albeit slowly. Recommended that the program be continued...