by devadmin | May 6, 2020 | Sewers, Waste Water
Sewer master plan for a 66 square mile region. The district had been in one geographic basin for 25 years, but had recently been given responsibility for a much expanded area and two new trunk sewer systems. The work of projecting growth rates an land use patterns was...
by devadmin | May 6, 2020 | Sewers, Waste Water, Waste Water Pump Stations, Water Pump Stations
Design and construction services on 24,000 feet of sanitary sewers and forcemains, and two new sewage pumping stations for the Bell Road Subdivision.
by devadmin | May 6, 2020 | Sewers, Waste Water
Design of 1,300 feet of sewer, including two jack and bores. During the study phase, inversion lining and slip lining were considered for parts of the sewer project. The project also included replacement of pumping equipment and installation of a new radio alarm...
by devadmin | May 6, 2020 | Sewers, Waste Water
Elmira Road Trunk Sewer Replacement. Design of 3,500 feet of 54- inch sewer to replace an existing sewer which was damaged by hydrogen sulfide corrosion. To protect the new sewer, PVC lined concrete pipe was specified.
by devadmin | May 6, 2020 | Mobile Home Parks
Served as an expert witness in a case where sewage backed up from the sewer system into a mobile home. After an initial site visit, the mobile home park disclosed that it did in fact have plans of the sewer system, which previously they denied having. Made a second...