City of Alameda, CA

Conducted a feasibility study of installing a mechanically cleaned bar screen on a stormwater pump station. Received the assignment on Friday. Delivered the report to the City engineering staff on Monday afternoon for use in a meeting with the City Manager on Tuesday...

City of El Segundo, CA

Project manager on the feasibility study and design of a storm water pump station modification project. The feasibility study analyzed the alternatives of two separate pump stations versus a single pump station connected by 1,300 feet of 60 inch sewer. The single pump...

Well Drilling Program Evaluation, Belize

Conducted an evaluation of a well drilling program in Belize for USAID. Determined that the program was far behind schedule but that USAID was only paying for work that was done and that progress was being made, albeit slowly. Recommended that the program be continued...

Placer County

Conducted an investigation of the technical feasibility of transporting alum sludge from a water treatment plant through a long gravity sewer, pump station, force main and siphon to a wastewater treatment plant. Focus was on practical problems likely to be caused by...

Gavilan College Water Supply Evaluation

Prepared a report evaluating the water supply of Gavilan College, Gilroy, CA. The college is served by a 50 year old well and one storage tank on a nearby hill. There is an emergency connection to the City of Gilroy distribution system. The college wanted to consider...