City of Burlingame

Design of the California-Grove Stormwater Pump Station. The facilities included: a 28 CFS (18 MGD) pump station using submersible pumps; a standby generator; a storage building; drain inlets and piping; and site improvements. The construction cost of the facilities...

San Carlos Airport

Provided technical advice on stormwater improvements to accommodate further development of the site. The airport authority questioned how additional stormwater piping without any additional pumping capacity could increase the capacity of the overall stormwater system....

City of San Juan Capistrano

Prepared a Water Quality Plan for the City of San Juan Capistrano to control non-point sources of pollution. This plan is a part of stormwater work mandated by the Clean Water Act.

Flooded Or Moist Crawl Spaces

Consulted on approximately 25 cases where there was flooding or excessive moisture in crawl spaces. Many of these cases were in the lower East Bay (Hayward and San Leandro, CA) where the ground surface is only a few feet above sea level and is very flat, providing...

Private Residence, Pleasanton, CA

Provided technical advice in a situation where surface flow from an uphill property was discharging on to the property of a lower residence. Advised on laboratory testing that would determine the source of the flow and on further observations that should be made. -...