My Blog

 

Home » Blog

Pinecrest Permittees Association

Conducting a "repair, replace, or abandon" evaluation on the rotating biological contactor (RBC) process at this small treatment plant in the Sierras. When the shaft of the existing RBC unit broke for the second time, the Association requested an evaluation of whether...

Oro Loma Sanitary District

Preliminary engineering report on a belt filter press facility to be constructed in an existing vacuum filter building. Because of the relatively large press capacity and difficulty of accessing the trucks that will haul the pressed cake away, consideration was given...

Surfacing Septic Tank Effluent

Reviewed voluminous documents and summarized the technical facts for the attorneys for two insurance companies, whose insureds were being sued by a downslope neighbor who claimed that their septic systems were discharging on to his property. Interviewed the...

Placer County SMD No. 1

Prepared a preliminary engineering report for the expansion of this wastewater treatment plant. The hydraulics of the plant were investigated and various piping improvements were identified to increase the hydraulic capacity of the plant. A third train of rotating...

Mariposa County

Design of small diameter variable grade effluent sewers and mound disposal systems for three rural communities. The work included a review of available technical literature on these innovative technology systems and discussions with experts throughout the United States.